Begin with a load assessment
Buildings have a fixed supply that already serves lifts, lighting and homes. An electrical assessment shows how much capacity can safely be used for charging, and whether a dedicated supply is needed.
Choose a charging format
- Per-bay AC chargers installed for individual residents.
- Shared AC charging points for common use.
- Compact socket-based charging where space or budget is tight.
Settle metering and billing
Decide how electricity used for charging is measured and billed, so common-area costs are not carried by non-users. The approach depends on the supply arrangement.
Get resident agreement and start in phases
Share the plan with residents, agree access and rules, and begin with the bays in demand. Design the electrical backbone for future expansion.