Complete EV Charging Infrastructure Solutions

SpeedoCharz can support your project from the first planning conversation through charger installation and commissioning — one team, one plan, a clear path from idea to a working charging site.

The project lifecycle

Ten stages, grouped into five phases. Every project is different, so the exact scope — and which stages SpeedoCharz delivers — is agreed with you up front.

  1. 01Discover

    Site Assessment

    Visit and review the location, parking layout, access and available space.

  2. 02Discover

    Electrical Load Assessment

    Review the existing supply, sanctioned load and available capacity.

  3. 03Plan

    Infrastructure Planning

    Plan cabling, protection, civil works and layout for the chosen configuration.

  4. 04Plan

    Charger Selection

    Match AC, DC or socket-based chargers and power ratings to vehicles and usage.

  5. 05Supply

    Electrical Infrastructure Development

    Prepare the supply side — panels, cabling and earthing — to the agreed design.

  6. 06Supply

    Charger Supply

    Supply of the selected chargers and associated equipment.

  7. 07Install

    Installation

    Mount, connect and secure the chargers to the planned layout.

  8. 08Commission

    Testing and Commissioning

    Test the installation and bring the chargers into service.

  9. 09Commission

    Operational Handover

    Hand over the working site with operating guidance for your team.

  10. 10Commission

    Maintenance and Support

    Ongoing support where included in the agreed scope.

Why a single point of responsibility helps

Fewer hand-offs

Planning, equipment and installation decisions are made together, not passed between disconnected vendors.

Right-sized equipment

Chargers are selected after the load assessment, so equipment and electrical capacity match.

Clear scope

You know what is included, what is the customer's responsibility and what needs third-party approvals.

A note on scope

Not every service is available on every project. Utility approvals, civil works and maintenance arrangements depend on the site and are confirmed in the proposal.

Let's plan your charging project

Share your location, vehicles and goals. We will tell you what is feasible and what we would need to confirm.